Let n1 and n2 be the speeds in km/hr and let nj be
the greater speed i.e., n1 > n2
⇒ n1 - n2 = 4
⇒ n1 = 4 + n2
⇒ n2(4 + n2)= 120 x 4
⇒ n22 + 4n2 - 480 = 0
⇒ n2 = 20 or -24 (rejected)
∴ n1 = 4 + n2 = 24km/hr
Hence speeds are 24 km/hr and 20 km/hr
Alternatively
Options may also be substituted to find the result.
⇒ n1 - n2 = 4
⇒ n1 = 4 + n2
⇒ n2(4 + n2)= 120 x 4
⇒ n22 + 4n2 - 480 = 0
⇒ n2 = 20 or -24 (rejected)
∴ n1 = 4 + n2 = 24km/hr
Hence speeds are 24 km/hr and 20 km/hr
Alternatively
Options may also be substituted to find the result.

= Rs. 25
hrs?
work is
left of which A will finish 6/48 th of work on
10th day and B will finish remaining work on 11th day.
Thus, I is false
II. Work done by A, B, C together in 9 days = 39/48
Work left = 1 - (39/48) = 9/48 th of the whole.
On the 10th day B will finish 1/12 th of the whole.
∴ work left = (9/48) - (1/12) = 5/48 th of the whole.
On 11th day C will finish 1/16 th of the work
∴ work left = (5/48) - (1/16) = 2/48 th of the whole
which will be done by A on the 12th day.
Thus, work will be finished on the 12th day.
Thus, II is false.
III. Work done by A, Band C in 9 days = 39/48
Work left after 9 days = 1 - (39/48) = 9/48 th of the whole
On the tenth day 1/16 th will be finished by C.
∴ work left = (9/48) - (1/16) = 6/48 th of the whole,
which will be finished by A on the eleventh
day. Thus, III is true.