0. A can do piece of work in 8 days which B and C can do in 12 and 16 days respectively. If they work on alternate days, then which of the following is true?

  • Option : C
  • Explanation :
    I. Work done by A, Band C together in 3 days

    work is
    left of which A will finish 6/48 th of work on
    10th day and B will finish remaining work on 11th day.
    Thus, I is false

    II. Work done by A, B, C together in 9 days = 39/48
    Work left = 1 - (39/48) = 9/48 th of the whole.
    On the 10th day B will finish 1/12 th of the whole.
    ∴ work left = (9/48) - (1/12) = 5/48 th of the whole.
    On 11th day C will finish 1/16 th of the work
    ∴ work left = (5/48) - (1/16) = 2/48 th of the whole which will be done by A on the 12th day.
    Thus, work will be finished on the 12th day.
    Thus, II is false.

    III. Work done by A, Band C in 9 days = 39/48
    Work left after 9 days = 1 - (39/48) = 9/48 th of the whole
    On the tenth day 1/16 th will be finished by C.
    ∴ work left = (9/48) - (1/16) = 6/48 th of the whole, which will be finished by A on the eleventh day.
    Thus, III is true.