Pipeline and Vector Processing Q.16

  • Option : D
  • Explanation : For 6 stages, non-pipelining takes 6 cycles There were 2 stall cycles for pipelining for 25% of the instructions
    So pipe line time = [1+(2 25/100)] = 3/2 = 1.5
    Speed up = Non– pipeline time/Pipeline time = 6/1.5